Past Projects
Although these projects may seem to be simple or basic tasks, we have very limited resources to undertake them at Samrong. Naturally the most important and essential products are dealt with first, and we categories the importance and necessity by the impact on the lives and future lives of our children.
Security Gates & Hut
At the entrance to Samrong new metal gates have been installed to protect the premises. Just inside the gate, to the left, a small hut for controlling admission has been built. The work was completed by several ex-Samrong children who have now graduated in various professions, including construction and engineering. In this way the costs are kept down and we only require funding for the materials.
Repainting Entrance (External)
The approach to Samrong had started to look quite rundown over the past few years but, with help, the outside wall has now been renovated and repainted. Some might say that it is money wasted but this is home to many and we all feel that the outside should look welcoming and lively to mirror the ethos of the Samrong Children’s Farm.
Interior Redecoration
Various areas at Samrong have been painted and this is an ongoing process, as the are about 60 children running around at any one time. The dining area has been painted with artwork by the children.